The $1.95 billion automated people mover is a 2.25-mile elevated guideway train system and the centerpiece of Los Angeles International Airport’s Landside Access Modernization Program. An overview of the project and challenges associated with building an elevated APM system within the central terminal area at one of the busiest airports in the U.S. will be included, as well as in depth discussion on the seismic analyses, unique box-girder design and segmental portions of the guideway. Two-level seismic design criteria included a 150-year operating design earthquake and a 2,500-year maximum design earthquake, as well as displacement-based design and project-specific material strain limits. The presentation will also discuss the hybrid system created by combining cast-in-place segmental main spans, up to 275 feet, with traditional CIP-on-falsework backspans within the same continuous frame. | Presenters: Chester Werts, Anthony Messmer